9. 10. 2013
Výzva k předložení nabídek se týká zajištění rekonstrukce a modernizace čistírny odpadních vod.
Zájemci o tento tendr obdrží další informace na vyžádání.
Upgrading of Son Tra Wastewater Treatment Plant, which includes the final design and construction of the following facilities to treat an average day flow of 25,500 m3/day for the Phase I including 20,500 m3/d of domestic wastewater and 5,000 m3/d of fish processing wastewater. The facilities include Administration Building with Control center; Raw domestic wastewater screening and grit removal; Fish waste equalization and pumping; Fish waste screening and pretreatment; Biological treatment units; Disinfection; Sludge holding and dewatering; Odor control system; and Standby generator.
ZDROJ: Bussinesinfo.cz